California Institute of Technology, Pasadena, CA
This was a 20,000 square foot complete renovation of the Guggenheim Graduate Aeronautics laboratory building featuring unique design concepts. By prefabricating the curving, undulating ceiling soffit assembly offsite, IDC saved two months from the construction schedule.